Notice: Undefined index: linkPowrot in C:\wwwroot\wwwroot\publikacje\publikacje.php on line 1275
[100440] Artykuł: Functionality and reliability of horizontal control net (Poland)Czasopismo: Open Geosciences Tom: 12, Zeszyt: 1, Strony: 668-677ISSN: 2391-5447 Wydawca: DE GRUYTER POLAND SP Z O O, BOGUMILA ZUGA 32A STR, 01-811 WARSAW, MAZOVIA, POLAND Opublikowano: 2020 Autorzy / Redaktorzy / Twórcy Grupa MNiSW: Publikacja w czasopismach wymienionych w wykazie ministra MNiSzW (część A) Punkty MNiSW: 40 Klasyfikacja Web of Science: Article Pełny tekst DOI Web of Science Keywords: class 3 horizontal control  operational reliability  condition criteria  |
Horizontal control networks established with monuments are functional if the conditions related to the number of control points, their density, condition and stability of coordinates are met. For functionality defined in those terms, deterministic accuracy characteristics are of little use. The subject matter discussed herein includes the two key features of geodetic control points, i.e., usability and stability. Due to the varying properties of those variables and the impact of the operating time of the system, there is no alternative to reliability-based approach in developing the functionality model. The measures of functionality and the procedures of data acquisition for developing the model of the control network destruction process have been defined. The solution presented herein is relevant for geodetic practice, providing a standard procedure for defining the time frame and the scope of the control network upgrading. The identified destruction process model optimizes this task assuming critical states expressed by the functionality probability. The applied approach is an example of the reliability theory-based approach typical for engineering. The issue of simulating the destruction process is illustrated with the results of the tests of class 3 control networks conducted in Kielce and Lodz regions in Poland. As a result of the tests, the characteristic properties of the control network destruction process have been identified. It was also shown how the patterns of usability and accuracy of the geodetic control points are relevant on the stage of implementing investment project tasks.